top of page
AquaDivert Development Plan Future Product Phases
Projects
.png)
Phase 1 — Patent protection and engineering
This is where AquaDivert sits right now. Expanding the patent protection, refining the engineering, and locking in the design so the product line has solid ground to build on.



Phase 2 - AquaDivert Pro
-
The next generation, built for contractors who use it every day.
-
Faster to fit and faster to pull out. A stronger seal using inflatable technology, inside the pipe and out. Heavier grade materials for full-time site work. Standardised sizing built around what contractors actually run. Pressure control with parts you can replace instead of replacing the whole unit.
bottom of page
